In 2017, the Duoguard hybrid anode system has been an instrumental part of repairs and corrosion protection undertaken by Melbourne Water on over 6 kilometres of steel reinforced concrete retaining wall at the Patterson Lakes tidal canals.

This project was not without it’s challenges, due to the tightly congested steel throughout the retaining wall structure, and difficulty of access, dictated by tides. There was also a need to undertake repairs as unobtrusively as possible to minimise disruption to the residents’ in the area, a process which was staged over the course of many months.

With assistance from Duoguard system inventors, Concrete Preservation Technologies Ltd in the United Kingdom, a bespoke solution was engineered to overcome the extremely congested steel within the retaining wall, and development and production of these specialised ‘Duoguard 800 Slim’ hybrid anodes was completed without delay to a very tight project timeline.

Working closely with the specifying engineer, contract administrator and installer of the system, Duoguard Australia Pty Ltd has ensured that the project was completed on time, and that lasting corrosion protection has been delivered to the Patterson Lakes retaining wall.

 

Read the full Article online at the Herald Sun

This entry was posted onThursday, February 15th, 2018 at 5:02 am and is filed under Projects. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site. Both comments and pings are currently closed.